Time-Dependent Path Scheduling
US$27.50
15% OFF CODE: SAVE15
Description
Moving assembly lines are the stepping stone for mass production of automobiles. Here, every second counts, which necessitates planners to meticulously optimize them. A crucial factor is each worker’s nonproductive walking time between the moving workpiece and line-side material containers for picking up required material. Minimizing the walking time is difficult because the workpiece moves steadily. Helmut A. Sedding devises algorithms to optimize the sequence of work operations, and the placem