FIDIC - A Guide for Practitioners

by Unknown

★★★★★
4.7 (600)

US$9.99

15% OFF CODE: SAVE15

Description

In 1999, a suite of three new conditions of contract was published by FIDIC, following the basic structure and wording harmonised and updated around the previous FIDIC Design-Build and Turnkey Contract (the 1992 ‘‘Orange Book’’). These conditions, known as the ‘‘FIDIC rainbow, were the Conditions of C- tract for: l Construction, the so-called Red Book, for works designed by the Employer l Plant and Design-Build, the so-called Yellow Book, for works designed by the Contractor l EPC/Turnkey Projec

Explore Related Tags